Machine Construction


rocket


The Crossed Molecular Beams Machine was designed over a period of eight months; 320 drawings were prepared utilizing ACAD 2D and 3D modeling software. Kurt Lesker Company was contracted to build the Main Chamber, Rotating Platform, and Detector Housings. Smaller items such as supersonic sources (UHV laser ablation source, pyrolytic and photolytic sources), cold shields, HV insulation units, and electronics were 
done by the Chemistry Machine and Electronics Shop as well as by the Physics Machine Shop.



Front View of the Main Chamber



Bottom View of the Main Chamber



Side View of the Main Chamber



Stress Analysis of the Main Chamber



Rotatable Platform


Rotatable Platform




Electronic Racks to Operate the Crossed Beams Machine